ebooks logo journals logo reference works logo abstract databases logo
bullet  SIGN IN Register | Why Register? | Got a Voucher? alerts   marked lists   shopping cart 

informaworld

HOME   |   SEARCH   |   BROWSE
    Issues List       Latest Issue       Forthcoming Articles       Volume 46 Issue 24       Subscribe       Article       References       Related articles      
<< firstfirst   < prevprev   Table of contentstoc   next >next   last >>last
Publisher Logo Publication Cover
Search within this journal

Estimating manufacturing cycle time and throughput in flow shops with process drift and inspection 

Authors: Mandar Chincholkar a; Jeffrey W. Herrmann b
Affiliations:   a Intel Corporation, Hillsboro, OR, 971 214 0005, USA
b University of Maryland, College Park, MD, 301 405 6572, USA
DOI: 10.1080/00207540701513893
Publication Frequency: 24 issues per year
Published in: journal International Journal of Production Research, Volume 46, Issue 24 December 2008 , pages 7057 - 7072
First Published: December 2008
Formats available: HTML (English) : PDF (English)
Article Requests: Order Reprints : Request Permissions


Abstract

Process drift is a common occurrence in many manufacturing processes where machines become dirty (leading to more contamination) or processing parameters degrade, negatively affecting system performance. Statistical process control tracks process quality to determine when the process has gone out of control (has drifted beyond its specifications). This paper considers the case where parts examined at a downstream inspection station are used to determine when the upstream process is out of control. The manufacturing cycle time from the out of control process to the downstream inspection process influences the detection time that elapses until the out of control process is noticed and repaired. Because an out of control process produces more bad parts, the detection time affects the number of good parts produced and the throughput of the manufacturing system. This situation is common in many industries but no models of the phenomena exist. This paper presents a novel manufacturing system model based on queueing network approximations for estimating the manufacturing cycle time and throughput of such systems. These are important performance measures since they influence economic measures such as inventory costs and revenue. The model can be used for a variety of system design and analysis tasks. In particular, the model can be used to evaluate the placement of inspection stations in a process flow.
Keywords: Design for Production; Cycle time; Design; Process drift
view references (17)
Bookmark with:
  • CiteULike
  • Del.icio.us
  • BibSonomy
  • Connotea
  • More bookmarks
Privacy Policy | Terms & Conditions | Accessibility | RSS
FAQs in: English . Français . Español . 中文(简体和繁體)
© 2009 Informa plc