Ein verfahren f
r die exakte behandlung von problemen der ablaufplanung mit hilfsmittelbeschr
nkungen
*
Author:
Klaus Hofstedt a
| Affiliation: | a ORZ des VEB Leuna-Werke, Walter Ulbricht, Leuna |
DOI:
10.1080/02331887208801080
Publication Frequency:
6 issues per year
Subjects:
Mathematical Statistics;
Statistical Theory & Methods;
Statistics;
Statistics for the Biological Sciences;
Stochastic Models & Processes;
Formats available:
PDF
(English)
View Article:
View Article (PDF)
Abstract
The point of departure of this paper is the planning and scheduling of a project by using the critical path method for a block diagram. The network is represented as a graph, and the task of scheduling the time is formulatod as a potential problem. Considering available resource levels in realizing a project, the graph is extended and several constraints are formed for a flow in the extended graph. These constraints and the potential problem lead to an integer linear programming problem with the object of minimizing the time. Finally, by using an example the structure of the linear programming problem is displayed and an algorithm for solving the problem is mentioned.
|
|
*
1Auszug aus der TH Chemie ,Carl Schorlemmer" Leuna-Merseburg angenommenen Dissertation des Verfassers.
|
| view references (3) |

Download Citation


CiteULike
Del.icio.us
BibSonomy
Connotea